Port Facilities

1270

Reefer connection points

50

Connection points outside the terminal

5

Reefer repair gangways

3

Power transformation plants

Reefer monitoring, computerized monitoring and control by personnel

Equipment

Crane

65-Ton Super Post Panamax.

Crane

 40-Ton Post Panamax.

Crane

36-Ton Panamax.

Crane

32-Ton Feeder.

Transtainers

7 Transtainer cranes of 40 Tons.

Reach Stackers

9 45 Ton Reach Stackers

Operations

Vessels working schedule is carried out in work  days, and can be designated at any time during the work day:

  • 08:00-14:00
  • 14:00-20:00
  • 20:00-02:00
  • 08:00-12:00 y 14:00-18:00